The Terminator: Concrete Debris Crevice by the Waste Incinerator at Cyberdyne Systems Ruins
☣️ Zon Bahaya Industri & Radiasi
Spesifikasi Seni Bina
- Tahun Dibina
- 1984 Eve of Judgment Day
- Nilai Anggaran
- $100,000,000 USD (T-800 Microprocessor Fragment Residue)
- Ciri Istimewa
- A slab crevice on the molten steel plant floor where the lingering residual heat has not cooled since the T-800's thumbs-up sank beneath the slag.
- Keputusan Penilai AI
- A metallic battleground bedroom where you spend the night whispering 'I'll be back' at the ground zero of humanity's showdown against machines.