The Terminator: Concrete Debris Crevice by the Waste Incinerator at Cyberdyne Systems Ruins
☣️ 産業災害・放射能・重汚染区域
建築仕様書
- 建築年
- 1984 Eve of Judgment Day
- 推定評価額
- $100,000,000 USD (T-800 Microprocessor Fragment Residue)
- 特別機能
- A slab crevice on the molten steel plant floor where the lingering residual heat has not cooled since the T-800's thumbs-up sank beneath the slag.
- AI鑑定士 総評
- A metallic battleground bedroom where you spend the night whispering 'I'll be back' at the ground zero of humanity's showdown against machines.