The Terminator: Concrete Debris Crevice by the Waste Incinerator at Cyberdyne Systems Ruins
☣️ Zones Industrielles à Risque et Radioactives
Spécifications Architecturales
- Année de Construction
- 1984 Eve of Judgment Day
- Valeur Estimée
- $100,000,000 USD (T-800 Microprocessor Fragment Residue)
- Caractéristique Spéciale
- A slab crevice on the molten steel plant floor where the lingering residual heat has not cooled since the T-800's thumbs-up sank beneath the slag.
- Verdict de l'Expert IA
- A metallic battleground bedroom where you spend the night whispering 'I'll be back' at the ground zero of humanity's showdown against machines.